Roads
Periodic Maintenance of the N1 Road — Nicoadala / Lua Lua (60 km)

Contract sheet
Contract details
- Client
- ANE — National Roads Administration
- Province and districts
- Zambézia — Nicoadala
- Period
- Since 2025
- Status
- Ongoing
- SC Nasser's role
- Main contractor
Technical data
- 60 km of paved road on National Road N1
- Pavement and drainage rehabilitation
- Shoulder reconstruction, road signage and road safety
For the Zambézia Provincial Delegation of the National Roads Administration, SC Nasser is carrying out periodic maintenance of 60 km of National Road N1 between Nicoadala and Lua Lua.
The works cover pavement and drainage rehabilitation, shoulder reconstruction and the renewal of road signage and safety features, using the company's own heavy fleet.
Gallery
Project images




More projects
Related projects
40 km
of National Road N324
Zambézia
ANE · Zambézia
N324 Paving — Maganja da Costa–Rio Muedebo (40 km)
Engineering design and paving of 40 km of National Road N324 in Zambézia, for ANE, under the Mais Estradas 2031 programme.
49 km
of National Road N324
Zambézia
ANE · Zambézia
N324 Paving — Muedebo River–Munhiga River (49 km)
Engineering design and paving of 49 km of National Road N324 in Zambézia, for ANE, under the Mais Estradas 2031 programme.
49 km
of National Road N324
Zambézia
ANE · Zambézia
N324 Paving — Munhiga River–Pebane (49 km)
Engineering design and paving of 49 km of National Road N324 in Zambézia, for ANE, under the Mais Estradas 2031 programme.