Water and Sanitation
Water Supply at 8 Health Centres — Mulevala and Pebane
8
health centres
Zambézia
Contract sheet
Contract details
- Client
- Provincial Directorates of Public Works (DPOP)
- Funder(s)
- UNICEF Mozambique
- Province and districts
- Zambézia — Mulevala, Pebane
- Period
- 2021–2022
- Status
- Completed
- SC Nasser's role
- Main contractor
- Contract reference
- 47E001041/CP/0003/2021 — Lot I
Technical data
- 8 health centres in Mulevala (2) and Pebane (6)
- Per centre: productive borehole, solar pump, elevated tank and network
For the Zambézia Provincial Directorate of Public Works, with UNICEF funding, SC Nasser built and rehabilitated water supply at 8 health centres — 2 in Mulevala and 6 in Pebane.
At each centre: a productive borehole, a solar-powered electric pump, an elevated tank on a tower and a water network. Sanitation and waste management at the same centres were delivered under the complementary contract (sanitation Lot I).
More projects
Related projects
CompletedUNICEF Mozambique · Nampula, Zambézia and Sofala
Water and Sanitation in 40 Health Centres — Nampula, Zambézia and Sofala
Boreholes, solar pumping and sanitation infrastructure at 40 health centres, delivered as main contractor for UNICEF.
102 kW
solar PV
Niassa
SPI Niassa · Niassa
Rehabilitation and Expansion of the Marrupa Water Supply System
Rehabilitation and expansion of Marrupa town's water system, with large-diameter boreholes, 102 kW of solar power and telemetry.
OngoingFIPAAS · Sofala
Rehabilitation and Expansion of the Búzi Water Supply System
FIPAAS emergency works, funded by the World Bank, to restore and expand water supply to Búzi town.
Have a similar project?
SC Nasser delivers water and sanitation, road and civil construction works, licensed nationwide.