Rehabilitation and Expansion of the Búzi Water Supply System

FIPAASSofalaSince 2026
Armação do reservatório do sistema de água do Búzi

Contract sheet

Contract details

Client
FIPAAS — Water Supply and Sanitation Asset Investment Fund
Funder(s)
World Bank
Province and districts
Sofala — Búzi
Period
Since 2026
Status
Ongoing
SC Nasser's role
Main contractor
Contract reference
FIPAAS/EMER/W-01/26 — Lot 6

Technical data

  • New river intake on the Búzi River
  • Water treatment with 100 m³/h capacity
  • DN 200 transmission main and distribution network
  • 320 m³ reinforced concrete reservoir and electrical system

Under FIPAAS's emergency works programme, funded by the World Bank, SC Nasser is rehabilitating and expanding the Búzi water supply system in Sofala province.

The contract replaces the river intake, installs 100 m³/h water treatment, a new DN 200 transmission main and the distribution network, and builds a 320 m³ reinforced concrete reservoir with its electrical system. Throughout the works, SC Nasser keeps the town supplied through temporary bypass connections.

Gallery

Project images

Equipa da SC Nasser na armação do reservatório do Búzi
Reservatório do sistema de água do Búzi em execução
Laje do reservatório betonada no Búzi
Tubagem da rede de distribuição em vala no Búzi
Reunião de segurança em obra no Búzi