Bloco sanitário com rampa de acesso num centro de saúdeCompleted

UNICEF Mozambique · Nampula, Zambézia and Sofala

Water and Sanitation in 40 Health Centres — Nampula, Zambézia and Sofala

Boreholes, solar pumping and sanitation infrastructure at 40 health centres, delivered as main contractor for UNICEF.

2024–2025

102 kW

solar PV

Niassa

Ongoing

SPI Niassa · Niassa

Rehabilitation and Expansion of the Marrupa Water Supply System

Rehabilitation and expansion of Marrupa town's water system, with large-diameter boreholes, 102 kW of solar power and telemetry.

Since 2026
Armação do reservatório do sistema de água do BúziOngoing

FIPAAS · Sofala

Rehabilitation and Expansion of the Búzi Water Supply System

FIPAAS emergency works, funded by the World Bank, to restore and expand water supply to Búzi town.

Since 2026

5

solar multi-use systems

Cabo Delgado

Completed

UNICEF Mozambique · Cabo Delgado

Construction of 5 Solar-Powered Multi-Use Water Supply Systems — Cabo Delgado

Five solar multi-use water systems in Palma and Mocímboa da Praia, delivered as main contractor for UNICEF.

2025–2026

19

boreholes and water systems

Sofala

Completed

DPOP · Sofala

Boreholes and Water Supply Systems in 8 Districts of Sofala

Provincial campaign of boreholes and water supply systems across eight Sofala districts, for DPOP Sofala with European Union funding.

2023
Torre de água e edifício do sistema de abastecimento de MajuneCompleted

TONE Engineering · Niassa

Majune Water Supply System

Grid-powered water supply system with large-diameter boreholes, delivered by SC Nasser as subcontractor to TONE Engineering, in a DNAAS project funded by JICA.

2023–2025

5

10" production boreholes

Niassa

Completed

SPI Niassa · Niassa

Malila Water Supply System

Water supply system with five large-diameter boreholes, for SPI Niassa (then DPOPHRH Niassa), under PRONASAR.

2021–2023

8

health centres

Zambézia

Completed

DPOP · Zambézia

Water Supply at 8 Health Centres — Mulevala and Pebane

Boreholes, solar pumping, elevated tanks and water networks at 8 health centres in Mulevala (2) and Pebane (6), for DPOP Zambézia with UNICEF.

2021–2022
Torre do sistema de água multiuso solar de Namuno, Cabo DelgadoCompleted

DPOP · Cabo Delgado

Design and Construction of 4 Solar Multi-Use Water Systems — Cabo Delgado

Design and construction of four solar multi-use water systems in Cabo Delgado, with detailed designs by SC Nasser.

2021–2022

4

solar water systems

Nampula

Completed

World Vision Mozambique · Nampula

4 Small Solar Water Supply Systems — Memba

Four complete systems — source, solar pumping, network and standposts — in Memba communities, for World Vision.

2023

3

solar multi-use systems

Zambézia and Nampula

Ongoing

DPOP · Zambézia and Nampula

3 Solar Multi-Use Water Systems — Pebane, Gilé and Eráti

Three solar multi-use water systems in Pebane, Gilé and Eráti, for the Zambézia and Nampula DPOPs, with World Bank funding.

Since 2026
Camião basculante e escavadora na manutenção da N1, ZambéziaOngoing

ANE · Zambézia

Periodic Maintenance of the N1 Road — Nicoadala / Lua Lua (60 km)

Periodic maintenance of 60 km of National Road N1 in Zambézia, for ANE.

Since 2025